ट्रैक रखरखाव के लिए कस्टम समाधान

JG100LT Advanced Railway Sleeper Replacement Machine for Efficient Track Maintenance
The JG100LT Railway Sleeper Replacement Machine is a high-performance solution designed for rapid and precise sleeper replacement in railway maintenance projects. Engineered with robust materials and advanced automation, it significantly reduces downtime and labor costs, making it ideal for global infrastructure teams. Key features include easy integration with excavator systems, enhanced durability for harsh environments, and user-friendly controls that ensure safety and efficiency. This equipment is perfect for international buyers seeking reliable, cost-effective tools to upgrade rail networks and boost productivity in construction and repair operations.
मद संख्या :
JG100LTऑर्डर(MOQ) :
1भुगतान :
L/C or T/Tउत्पाद की उत्पत्ति :
Chinaरंग :
yellowशिपिंग पोर्ट :
xiamenसमय सीमा :
15-45daysवज़न :
10000kgHundreds of sleepers can be replaced within a few hours, shortening the maintenance time of the lines, reducing the downtime of railways and improving operational efficiency.It has reduced the direct exposure of workers at the track site and lowered the accident rate. The overall safety of the working environment has been improved.Ensure that each sleeper is accurately replaced to enhance the stability and durability of the track and extend the service life of the railway.
|
Sleeper changer head |
|
|
Max. opening width of grab |
650mm |
|
Min. opening width of grab |
200mm |
|
Max. radius grabbing weight |
2t |
|
Max.width of grab |
3000mm(customizable) |
|
Grapple rotation angle |
360° |
|
Dimensions |
|
|
(Length*width*height)Transport dimensions |
6100*2800*2650mm |
|
Axle base |
2600mm |
|
Track gauge |
1570mm |
|
Width of Cravvler |
400mm |
|
Ground clearance of counterweight |
780mm |
|
Min.ground clearance |
280mm |
|
Angle of rotation |
360° |
|
Machine weight |
95000kg |
|
Note: Product parameters are subject to the actual product,and the right of interpretation and final interpretation belongs tothe company. |
|
Product Overview
JG100LT Railway Sleeper Replacement Machine Track Maintenance Equipment
JG100LT Specially tailored for narrow tunnels, steep slopes and geo-sensitive sections. The design of ultra-narrow articulated chassis breaks through the space limit and easily deals with low tunnel roof and sharp curve section. The intelligent pressure feedback pillow grasp system ensures that sleepers are replaced with zero damage and high precision, and the ballast leveling is realized synchronously.


Product Advantages

Effiient:Hundreds of sleepers can be replaced within a few hours, shortening the maintenance time of the lines, reducing the downtime of railways and improving operational efficiency.
Safety:It has reduced the direct exposure of workers at the track site and lowered the accident rate. The overall safety of the working environment has been improved.
Precision:Ensure that each sleeper is accurately replaced to enhance the stability and durability of the track and extend the service life of the railway.
Application scenarios


Q&A
Q: What are the main functions and advantages?
A: Efficient and automated replacement of railway sleepers, supporting multiple track specifications, and made of durable materials.
Q: Delivery time and mode of transportation?
A: The standard delivery time is 30 to 45 days, and sea transportation is supported.
Q: After-sales service?
A: We have established a global service system covering pre-sale, in-sale and after-sale services, and can respond to customer demands within 48 hours. Remote technical support and rapid global spare parts supply ensure that equipment malfunctions are resolved promptly.
Q: Is there support for machine customization to adapt to the track standards of different countries?
A: Yes, parameters can be customized as needed, on-site installation guidance and technical training are provided to meet the diverse demands of the world.